October 2025 Goals

Image

One month as faculty down!

September Goals Recap

Onboarding:

  • Completed all necessary trainings and set up office
  • Started purging through lab equipment, but haven’t gotten a chance to reorganize
  • Signed up for new PI promos but have yet to order any equipment
  • Almost finalized recirculating seawater system order

Teaching:

  • Reviewed 1C lab structure
  • Survived the first lab section and did some grading (s/o to the 1C team for making this transition painless!)

Green Crab Pilot Experiment:

Other:

  • CREATED MY LAB WEBSITE AND I LOVE HER!
  • Provided Christelle information to update my bio on the department website
  • Joined New PI Slack
  • Started the FSP to learn how to thrive in this job!
  • Connected with other California green crab researchers!

October Goals

Green Crab Pilot Experiment:

  • Try ASCA analysis
  • Outline discussion
  • Write discussion
  • Outline introduction
  • Write introduction
  • Modify abstract
  • Send first draft to Carolyn!

Biol 1C:

  • Keep grading
  • Keep reviewing lecture content

Plan Biol 195:

I’m incorporating all of my lab set up tasks into planning Biol 195, because I need to acquire experimental equipment for the lab and for the course. I’ll also need to think about which things are course-specific versus which things are lab specific, hence the combined framework.

  • Get CDFW permit
  • Purchase molecular equipment
  • Purchase physiology equipment
  • Send Daryn list of class-specific equipment
  • Finalize recirculating seawater system
  • Sort through existing sample and falcon tubes
  • Draft syllabus

West Coast Green Crab Experiment:

  • Revise physiology data analysis
  • Get SCU cluster access
  • Take RNA-Seq data through HiSat2
  • Take metabolomics data through WCNA

Other:

  • IRB training modules for RIE2
  • Continue through Generative AI course (complete ~3 more modules)

Back Burner

I haven’t worked on these projects in a while, but they are next on my to-do list. I don’t think they need to be in the deep freeze so I guess I gotta turn the back burner on!

Hawaii Gigas Methylation:

  • Revise methylKit code
  • Run bismark with the new C. gigas genome
  • Update methods and results
  • Revise discussion
  • Revise introduction
  • Revise abstract

Deep Freeze

Things that are not immediate enough to be on the backburner, so they’re stuck in the deep freeze.

Coral Transcriptomics:

These are things I need to do and can probably knock out in a week, but I think they’re a lower priority right now for me since there’s more momentum on other projects. At the very least, I need to reach out to collaborators and get this going again.

  • Revise abstract
  • Write discussion
  • Write introduction
Written on October 1, 2025