July 2025 Goals

Image

I’ve got one month left on Cape before I leave!!!!!!!!!!!!!! So Pedro is how I feel: tired, emotional, trying to survive. Not pictured: many moments of joy.

April Goals Recap

………plus everything between now and April

Cold Acclimation Green Crab Experiment:

West Coast Green Crab Experiment:

Perspective Piece:

  • Submitted perspective piece to ICB!

July Goals

West Coast Green Crab Experiment:

  • Determine why my library preparation keeps having low yield
  • Finish prepping remaining libraries
  • Re-prep any libraries that require it
  • Re-amplify samples with low but acceptable yields
  • Pool libraries
  • Send libraries for sequencing

Green Crab Pilot Experiment:

  • Finish -omics integration analysis
  • Finish -omics and physiology integration analysis
  • Update methods
  • Update results
  • Write discussion
  • Write introduction
  • Write abstract

Other:

  • Update my website
  • Make Bluesky

Back Burner

I haven’t worked on these projects in a while, but they are next on my to-do list. I don’t think they need to be in the deep freeze so I guess I gotta turn the back burner on!

Hawaii Gigas Methylation:

  • Revise methylKit code
  • Run bismark with the new C. gigas genome
  • Update methods and results
  • Revise discussion
  • Revise introduction
  • Revise abstract

Deep Freeze

Things that are not immediate enough to be on the backburner, so they’re stuck in the deep freeze.

Coral Transcriptomics:

These are things I need to do and can probably knock out in a week, but I think they’re a lower priority right now for me since there’s more momentum on other projects. At the very least, I need to reach out to collaborators and get this going again.

  • Revise abstract
  • Write discussion
  • Write introduction
Written on July 1, 2025